Skip to content
TRBook a meeting

Nora Care

Nora Care: Do not wait for the failure, see it coming.

Anticipates likely failures from telemetry, shows the root cause and connects the maintenance plan to your systems.

  • Will this machine warn me before it fails?
  • What is the likely cause of this alert?
  • When should I do the maintenance?

The situation today

  • Failures come at the worst time

    Unplanned downtime strains production, delivery and maintenance at once.

  • Calendar maintenance is not always right

    Some parts are replaced too early, others fail before their date.

  • An alarm, but no cause

    Finding where to look depends on experience.

How it works

Scroll down and Bakış follows the journey of an alert.

Nora CareAssets / Compressor 2Last 14 daysSample app · simulated data
Search…⌘ KEK
Assets
Compressor 1Normal
Compressor 2Warning
Injection Molding 3Normal
Press Line 2Monitoring
Cooling TowerNormal
Vibration · drive-end bearing live 4.8 mm/s
Anomaly alert Threshold exceeded
Compressor 2 · drive-end bearing · today 14:32
Root cause chain likely
Vibration rise · 2.1 → 4.8 mm/s
Bearing temperature 71 °C
Lubrication interval exceeded · last lubricated 46 days ago, plan 30 days
Estimated time remaining: 9 days · forecast
Bearing temperature °C · same time axis
Work order draft BK-0318
TaskBearing replacement and lubrication
TimeThursday 14:00
DowntimePlanned, 45 min
Part6205 bearing · 2 in stock
AssigneeMaintenance Team A
Approve Edit
Mon
Tue
Wed
Thu
14:00
Fri
Sat
Sun
Sample application screen; data is simulated.

Sample application screen; data is simulated.

Step 1

Trends are seen early

Measurements such as vibration and temperature are tracked; a deteriorating trend is flagged before the threshold.

  1. Step 1

    Trends are seen early

    Measurements such as vibration and temperature are tracked; a deteriorating trend is flagged before the threshold.

  2. Step 2

    Likely cause, step by step

    Related measurements and maintenance history are brought together and the likely cause chain is shown.

  3. Step 3

    Maintenance planned, approval yours

    A suitable time is suggested and a draft work order is prepared; approval stays with your team.

What changes

  • Early warning

    Deterioration is visible before it becomes a failure.

  • Likely cause

    The alert comes with where to look.

  • Draft work order

    The maintenance team does not start from scratch.

  • Your team decides

    The system suggests; you approve and plan.

Architecture

Nora Care reads machine measurements together with maintenance history and turns them into early warnings.

Data sources

  • Vibration, temperature, current
  • Nora IOT or existing sensors
  • Maintenance history and machine data

Nora Care · Nora layer

  • Trend and anomaly detection
  • Likely-cause analysis
  • Maintenance timing suggestion

Outputs

  • Alerts
  • Draft work orders
  • Hand-off to maintenance and ERP systems

Whether existing measurements are sufficient is assessed per machine; we tell you if anything needs to be added.

Connections and integrations

Measurement side

  • Nora IOT
  • Existing vibration and temperature sensors

Maintenance side

  • Maintenance management systems
  • ERP work order modules

The list is being finalised. Share your machine and system list and we will tell you exactly how we connect to each.

Use cases

  • Rotating equipment

    Compressors and pumps

    Bearing-related deterioration is flagged early.

  • Drives

    Motors and gearboxes

    Current and temperature changes are linked to the maintenance plan.

  • Critical line

    Bottleneck equipment

    Maintenance timing is aligned with the production plan.

Rollout

Every project follows the same four steps; scope and timeline are set together with you.

  1. Discovery

    We define the need, the existing systems and the success measure together.

  2. Pilot

    We set up the first version on a limited scope with your real data.

  3. Measure

    We evaluate the result against the measure agreed at the start.

  4. Scale

    We extend what works to other lines and teams.

Frequently asked questions

How is predictive maintenance different from planned maintenance?

Planned maintenance follows a calendar, even when the machine is in good condition. Predictive maintenance monitors the machine’s data and warns when a degradation trend appears. Nora Care shows the likely cause of the warning and suggests a suitable time for maintenance.

Which data is needed?

Measurements that reflect the machine’s condition, such as vibration, temperature and current. We review together, machine by machine, whether your existing data is sufficient and tell you which measurements to add if needed.

Does the system make the maintenance decision?

No. Nora Care warns, shows the cause and prepares a draft work order. Approval and scheduling stay with your maintenance team.

Other Nora products

  • Manufacturing

    Nora IOT

    Machine data and monitoring dashboards

    Collects machine data, on most machines without additional hardware and makes it visible in dashboards built for your business.

  • Manufacturing

    Nora Twin

    3D digital twin and simulation

    Brings process, MES and ERP data together in a single 3D factory model; try decisions in simulation first.

  • Services and commerce

    Nora BOT

    Chat assistant with corporate memory

    An AI assistant that works with your organisation’s own documents and is configured for your sector.

  • Services and commerce

    e-Nora

    Marketplace advertising and budget optimisation

    Monitors your marketplace ad campaigns and suggests, with reasons, where the budget could be shifted.

  • Manufacturing

    Nora Lens

    AI reporting in natural language

    ERP, MES or BPM: ask your data in your own words and get the answer as a report with tables and charts.

Would you like to see this product in your business?

Tell us briefly what you need; we will arrange an introductory call that suits you.