Skip to content
TRBook a meeting

Industries

Manufacturing

We collect machine data, show your factory in one model, warn you before failures and let you ask your data questions in your own words.

Sound familiar?

  • You hear about stoppages the next day

    Which machine stopped when, and why, is pieced together from spreadsheets after the shift.

  • Failures are still a surprise

    Maintenance follows a calendar, yet machines still stop unexpectedly.

  • Reports mean waiting in line

    Even a simple downtime or efficiency summary has to be requested from IT.

Who needs what?

  • Production manager

    Live line status and reasons for stoppages

    Nora IOT
  • Planning

    Testing an extra shift or line change before applying it

    Nora Twin
  • Maintenance team

    Seeing degradation early and tying maintenance to a plan

    Nora Care
  • Plant management

    Reports without waiting: downtime, efficiency, orders

    Nora Lens
  • Operator

    Instant access to error codes and instructions

    Nora BOT

Products used in this industry

  • Machine data and monitoring dashboards

    Nora IOT

    Collects data from machines, in most cases without extra hardware; stoppages and indicators are visible in real time.

  • 3D digital twin and simulation

    Nora Twin

    Combines process, MES and ERP data in one 3D model; decisions are tried in simulation first.

  • Predictive maintenance

    Nora Care

    Monitors telemetry, shows the likely cause of an alert and suggests a suitable time for maintenance.

  • AI reporting in natural language

    Nora Lens

    Ask your ERP, MES or BPM data in plain language; the answer comes back with tables and charts.

  • Chat assistant with corporate memory

    Nora BOT

    An operator assistant that works with machine manuals and instructions and shows the source of each answer.

Sample use cases

  • Nora IOT

    Mould changes and stoppages

    In injection moulding, mould changes and unplanned stops are tracked separately; the shift report is produced automatically.

  • Nora Care

    Compressors and pumps

    Bearing-related degradation is flagged early; a draft work order comes to you for approval.

  • Nora Lens

    Weekly downtime summary

    The production manager asks for the weekly downtime summary in one sentence; the query runs read-only.

Rollout

Every project follows the same four steps; scope and timeline are set together with you.

  1. Discovery

    We define the need, the existing systems and the success measure together.

  2. Pilot

    We set up the first version on a limited scope with your real data.

  3. Measure

    We evaluate the result against the measure agreed at the start.

  4. Scale

    We extend what works to other lines and teams.

Other industries

Let’s see how it would work for you

Tell us briefly about your industry and need; we will plan a suitable demo call.